| 05/01/2006 |
Shifting of 22KV Cable near car shed at Sanpada ROB. |
CIDCO |
| 18/02/2005 |
Power Supply arrangement for MBR Sector-2.6Kharghar,Navi Mumbai. |
CIDCO |
| 14/05/2005 |
Power supply arrangement to E.V.Regency at plot No-22. |
MSEB |
| 20/06/2005 |
Power supply arrangement to "Orion" at plot No-120 Sector-50 Nerul, navi Mumbai. |
MSEB |
| 17/10/2005 |
Providing temporary power supply arrangements to 600 Tenements "gharonda Housing Scheme" Sector-9, Ghansoli. |
CIDCO |
| 18/04/2005 |
Providing LT cable to the Zilla parised & District court building at Oros,Dist.Sindhudurg. |
CIDCO |
| 05/05/2004 |
The work of Internal Electrification along with area lighting Inside the Compound,TV cabling, and Telephone wiring of our residential cum Commercial complex.Trinty Residency,plot No-3,Sector-9 kamothe, Navi Mumbai. |
MSEB |
| 16/04/2004 |
The work of Internal Electrification along with area lighting Inside the Compound,TV cabling, and Telephone wiring of our residential cum Commercial complex.Orion,Sector-50,Nerul,Navi, Mumbai. |
MSEB |
| 30/09/2002 |
Work order no.PCS/Electrical/3211/2002 for L.T. Distribution repairing and new erection of SFU,4 way feeder pillar at our Socity Complex. |
CIDCO |
| 08/11/2002 |
Power supply Arrangement to the Socity's building at plot No.10, Sector-25,Nerul,Navi Mumbai. |
MSEB |
| 02/11/2002 |
Power supply Arrangement to our building, Millennnium park, at plot No-17,22 & 23, Sector-25,Nerul,Navi Mumbai |
MSEB |
| 09/11/2002 |
Power supply Arrangement to our building,Situated on plot No-19, Sector-25,Nerul, Navi Mumbai. |
MSEB |
| 24/07/2001 |
Supply,Installation,tesing &Commissioning of 2nos.750 KVA Dg sets for IDC of VSNL at 11p, Vashi Rly-station complex. |
CIDCO |
| 02/03/2000 |
Providing & Commissioning of street light on Palm Beach Marg. |
CIDCO |
| 20/01/2000 |
Providing Street lights on Mahape R.O.B/ and low level service and at Koperkhairane. |
CIDCO |
| 02/03/2000 |
Providing & Commissioning of street light on Palm Beach Marg. |
CIDCO |
| 15/12/2000 |
Shifting of 22KV HT line & cable near Dharave level crossing on Nerul - Uran Railway line. |
CIDCO |
| 19/06/2000 |
Replacement and rerouting of electrical cable for the Power supply arrangment to Airoli Railway station. |
CIDCO |
| 07/12/2000 |
Shifiting of 22KV HT line &cable Near Dharave Level crossing on Nerul- Uran Railway line. |
CIDCO |
| 17/03/1994 |
Power Supply arrangement to Collectorate &DSP office Buildings at Oras. Distist -Sindhudurg. |
CIDCO |
| 13/04/1994 |
Repairing of 100KVA, 22X0.43 KV Transformer. |
CIDCO |
| 13/04/1994 |
Repairing of 150 KVA 22X 0.43KV Transformer. |
CIDCO |
| 23/05/1994 |
Providing power supply for 18 Nos. of shops in Mahathma Gandhi Housing complex in sector-14 Vashi |
CIDCO |
| 23/05/1994 |
Shifting of 22 KV overhead H.T.line from 20M.wide road from Nerul Railway station to Sec-19, Nerul |
CIDCO |
| 26/05/1994 |
shifting of 22 KV overhead H.T.line in plot No.12 at sector-6, Airoli. |
CIDCO |
| 10/06/1994 |
Providing &Erecting 1X315 KVA 11/0.4 KV transformer substation at oras,Dist;sindhudurg. |
CIDCO |
| 10/06/1994 |
Providing laying and commissioning 11KV (E) 3CX 300 sq.mm. XLPE cable for MBR scheme at sector-2E,Kalamboli |
CIDCO |
| 01/08/1994 |
Part -1 Alternate Power supply arrangement to dewatering Pumps of Subway No.2 at Vashi Ply.Stn.Part-II Electrification of 2 wheeler Fee collection centre near High mart No.2 in the Forecourt area at Vashi Ply.Stn. Cum commercial complex. |
CIDCO |
| 27/10/1994 |
Providing H.T.Metering equipment for ESR/GSR sector- 5E & 6(W)at New Panvel Node. |
CIDCO |
| 12/12/1994 |
External Electrification with L.T. underground cable for construction power at N.R.T Housing,Nerul, |
CIDCO |
| 27/01/1995 |
Providing Street lightining in forecourt area of Kharghar Railway station cum Commercial Complex. |
CIDCO |
| 11/07/1994 |
Shifting of 22 KV H.T. Line from the plotr No.32, Sector-1 at Nerul. |
CIDCO |
| 15/06/1994 |
Operation & Maintance of Sub- station,Area/road lighting,D.G.sets ,Control Panels etc. in the fore Court are of vashi Railway station cum Commercial Complex. |
CIDCO |
| 07/07/1995 |
Conversion of 22KV Taloja- panvel over head line in to under ground cable at Belapur-Panvel Railway line at khandeshwar. |
CIDCO |
| 26/10/1995 |
Suppling erection and Commissioniong of 11KV straight joint near ESR/GSR in Sector -29 at Vashi. |
CIDCO |
| 10/04/1995 |
Providing 3CX300 Sq.mm 11KV(E) Power cable for Interconnection of the substations of mass housing Schemer,at sector -21,CBD/ Belapur. |
CIDCO |
| 17/01/1996 |
Providing and erecting 31/2X240 Sq.mm armoured cable to NRI housing project, nerul for resortingthe temporary power supply to M/s Shirke B.G Construction work. |
CIDCO |
| 22/01/1996 |
Providing and erecting 3.5X240 Sq.mm armoured cable to NRI housing project, Nerul for resorting the temparory power supply given from straight joint feeder pillar up to the site of M/s.B.G.Shirke |
CIDCO |
| 15/02/1996 |
Suppling erecting 31/2 CX240 Sq.mm armoured cable to NRI Housing project, Nerul for resorting the temporary power supply given from straight joint feeder pillar up to the site of M/s. Advance Construction Co. |
CIDCO |
| 16/08/1996 |
Providing laying and commissioning 11KV (E) 3CX 300 sq.mm. XLPE power cable for Interconnection of the S/S of Mass housing Scheme at Sec-21 to 25,Sanpada,Navi Mumbai. |
CIDCO |
| 30/10/1996 |
Providing area lighting for garden -cum-play ground in sector -7,Sanpada,Navi Mumbai. |
CIDCO |
| 20/02/1997 |
Replacement of 11KV (Earthed)3CX300sq.mm damaged cable at mass housing scheme at sec-9, Kopar khairane, Nvi Mumbai. |
CIDCO |
| 17/03/1997 |
Providing laying & commissioning of 11 KV 3CX300 Sq.mm XLPE cable for Inter Connection of substation and extending 11KV power supply to mass housing scheme at sec-46,48&48 (A) Nerul,Navi Mumbai. |
CIDCO |
| 28/05/1997 |
Providing laying & commissioning of 11 KV 3CX300 Sq.mm XLPE cable forming power supply to mass Housing Scheme in Sec-4,6,16&18,Nerul,Navi Mumbai. |
CIDCO |
| 9/10/1998 |
Supplying Installing Testing & Commissing of at 2 & 500 KVA D.G sets along with AMF Panel for Vashi Railway station Cum Commerical Complex. |
CIDCO |
| 03/11/1998 |
Award letter in respect of work pertaining to fitting and fixturs (Electricals) at CFS,Navi Mumbai. |
CIDCO |
| 26/04/1996 |
Providing ,laying and Commissioning of 11 KV (Earthed)3X300 sq.mm.XPLE Cable and other Electricals Equipment for ESR/GSR, Sector, Sector -44,Nerul &Sewage Pump House,Sector-50,Nerul.Navi Mumbai |
CIDCO |
| 24/02/1998 |
Restoration of Power supply to ESR/GSR,Sector-44,Nerul |
CIDCO |
| 09/11/1998 |
Shifiting of H.T.Pole from plot No.F-1, 12.5% scheme at Diwalpada, Belapur, Navi Mumbai. |
CIDCO |
| 09/09/1997 |
Providing Pumping machinery at MBR, Sector-9 Nerul, navi Mumbai. |
CIDCO |
| 15/12/1997 |
Providing erecting testing and commessioning 22/11/0.4 KV temporary out door type transformer substation for mass Housing scheme in sector-30,Dronagiri. |
CIDCO |
| 25/11/1998 |
Providing 200 KVA 22/11 KVA/433 Volts out door type transformer sub station with D.G.set at custom Bonded warehouse, Dronagiri Node,Navi Mumbai. |
CWC |
| 01/09/1999 |
Supply of materials for Electrical work for supply of H.T. Power from MSEB tapping point to central warehousing Corporation substation at custom Bonded warehouse (3.5 Ha.plot) Sector-1D' Node,Navi mumbai. |
CWC |
| 01/09/1999 |
Tender for electrical work proposed School for the DAV Trust at plot No.11. sector -10,Airoli, Navi Mumbai. |
|
| 27/10/1998 |
Award letter for work fittings and fixtures (Electricals) at CFS, Navi Mumbai |
CFS |
| 06/12/1999 |
Providing Power supply arrangement for neighbourhood shopping centre at sector-4 Nerul. |
CIDCO |
| 01/03/1999 |
Power supply arrangement to mass Housing scheme at sector-21 to 25, Sanpada,Navi Mumbai |
CIDCO |
| 09/09/1997 |
Augmentation of Pumping Capacity at MBR, Sector-18, Koperkhairane,Navi mumbai. |
CIDCO |
| 08/12/1994 |
Providing submercible pumpset at Sewage Pumphouse sector -12,kalampoli. |
CIDCO |
| 23/05/1994 |
Shifting of 22kV overhead H.T.line from 20 m.wide road from Nerul Railway station to sector 19, |
CIDCO |
| 26/05/1994 |
Shifting of 22KV overhead H.T.line Plot No-12, Sector-6, Airoli. |
CIDCO |
| 11/07/1994 |
Shifting of 22KV H.T.line from the Plot No-32, Sector-1 at Nerul. |
CIDCO |
| 06/11/1995 |
Providing pumping machinery and allied works for ESR/GSR Sector -19 Airoli, Navi Mumbai. |
CIDCO |
| 08/12/1997 |
Providing testing and commissioning of 500 KVA D.G sets along with AMF panel for Vashi Railway station Bldg.Cum Commerical Complex. |
CIDCO |
| 10/06/1997 |
Maintenance of transformer S/s for water supply pumping station in Vashi sanpada and Kopar khairane. |
CIDCO |
| 19/08/1997 |
Operation Maintenance of pump house &water tanks in NRI Housing complex at nerul,Navi Mumbai |
CIDCO |
| 27/03/1998 |
Shifting reatignment and conversion of H.T.overheadline of MSEB obstructing to mahape ROB. |
CIDCO |
| 09/11/1998 |
Laying & Commissioning of 3CX300 sq.mm 11 KVXLPE cable for providing power supply to mass houseing Scheme (CA No.1) at sector-46,48&48 (A),Nerul |
CIDCO |
| 09/11/1998 |
Urgent repairs at ESR in sector -5 Aireoli and MBR in Sector-19,Nerul. |
CIDCO |
| 21/09/1998 |
Electrical repair and maintenance of water supply installations in Nerul Node |
CIDCO |
| 06/08/1998 |
Power supply arrangement to sewage pump house sector-21 sanpada, navi Mumbai. |
CIDCO |
| 12/08/1998 |
Operation & Maintenance of for the work of Providing Pumping Mechinery and Allied work of ESR/GSR, Sector - 19, Airoli, Navi Mumbai. |
CIDCO |
| 06/08/1998 |
Maintenance of Electrical & Mechanical equipment & are lighting for water supply pumping station in CBD,Nerul & Airoli. |
CIDCO |
| 06/08/1998 |
Maintenance of Electrical & Mechanical equipment & area lighting for water supply Pumping stationin CBD, Nerul & Airoli |
CIDCO |
| 25/11/1998 |
Providing 200 KVA 22/11 KVA/433 Volts out door type transformer sub station with D.G.set at custom Bonded warehouse, Dronagiri Node,Navi Mumbai. |
CIDCO |
| 01/03/1999 |
Power supply arrangement to mass Housing scheme at sector-21 to 25, Sanpada,Navi Mumbai |
CIDCO |
| 01/11/1999 |
Providing,testing & Commissioning HT Switchgear,Transformer,LT Panels.HT/LT cables & necessarywiring for the power supply arrangement at Sanpada Rly- station Building cumCommercial complex. |
CIDCO |
| 08/04/1996 |
Maintenance of transformer Sub-station for water supply.Installations at Sanpada, vashi and Koparkhairane |
CIDCO |
| 25/02/1999 |
Maintenance of transformer sub station for water supply pumping station in Sanpoda, Vashi and Koperkhairane |
CIDCO |