Projects

Client List
   
 
05/01/2006
Shifting of  22KV Cable near car shed at Sanpada ROB.
CIDCO
18/02/2005
Power Supply arrangement for MBR Sector-2.6Kharghar,Navi Mumbai.
CIDCO
14/05/2005
Power supply arrangement to E.V.Regency at plot No-22.
MSEB
20/06/2005
Power supply arrangement to "Orion" at plot No-120 Sector-50 Nerul, navi Mumbai.
MSEB
17/10/2005
Providing temporary power supply arrangements to 600 Tenements "gharonda Housing Scheme" Sector-9, Ghansoli.
CIDCO
18/04/2005
Providing LT cable to the Zilla parised & District court building at Oros,Dist.Sindhudurg.
CIDCO
05/05/2004
The work of Internal Electrification along with area lighting Inside the Compound,TV cabling, and Telephone wiring of our residential cum Commercial complex.Trinty Residency,plot No-3,Sector-9 kamothe, Navi Mumbai.
MSEB
16/04/2004
The work of Internal Electrification along with area lighting Inside the Compound,TV cabling, and Telephone wiring of our residential cum Commercial complex.Orion,Sector-50,Nerul,Navi, Mumbai.
MSEB
30/09/2002
Work order no.PCS/Electrical/3211/2002 for L.T. Distribution repairing and new erection of SFU,4 way feeder pillar at our Socity Complex.
CIDCO
08/11/2002
Power supply Arrangement to the Socity's building at plot No.10, Sector-25,Nerul,Navi Mumbai.
MSEB
02/11/2002
Power supply Arrangement to our building, Millennnium park, at plot No-17,22 & 23, Sector-25,Nerul,Navi Mumbai
MSEB
09/11/2002
Power supply Arrangement to our building,Situated on plot No-19, Sector-25,Nerul, Navi Mumbai.
MSEB
24/07/2001
Supply,Installation,tesing &Commissioning of 2nos.750 KVA Dg sets for IDC of VSNL at 11p, Vashi Rly-station complex.  
CIDCO
02/03/2000
Providing & Commissioning of street light on Palm Beach Marg.
CIDCO
20/01/2000
Providing Street lights on Mahape R.O.B/ and low level service and at Koperkhairane.
CIDCO
02/03/2000
Providing & Commissioning of street light on Palm Beach Marg.
CIDCO
15/12/2000
Shifting of 22KV HT line & cable near Dharave level crossing on Nerul - Uran Railway line.
CIDCO
19/06/2000
Replacement and rerouting of electrical cable for the Power supply arrangment to Airoli Railway station.
CIDCO
07/12/2000
Shifiting of 22KV HT line &cable Near Dharave Level crossing on Nerul- Uran Railway line.
CIDCO
17/03/1994 Power Supply arrangement to Collectorate &DSP office Buildings at Oras. Distist -Sindhudurg. CIDCO
13/04/1994
Repairing of 100KVA, 22X0.43 KV Transformer.
CIDCO
13/04/1994
Repairing of 150 KVA 22X 0.43KV Transformer.
CIDCO
23/05/1994
Providing power supply for 18 Nos. of shops in Mahathma Gandhi Housing complex in sector-14 Vashi
CIDCO
23/05/1994
Shifting of 22 KV overhead H.T.line from 20M.wide road from Nerul Railway  station  to Sec-19, Nerul
CIDCO
26/05/1994 
shifting of 22 KV overhead H.T.line in plot  No.12 at sector-6, Airoli.
CIDCO
10/06/1994
Providing &Erecting 1X315 KVA 11/0.4 KV transformer substation at oras,Dist;sindhudurg.
CIDCO
10/06/1994
Providing laying and commissioning 11KV (E) 3CX 300 sq.mm. XLPE cable for MBR scheme at sector-2E,Kalamboli
CIDCO
01/08/1994
Part -1 Alternate Power supply arrangement to dewatering Pumps of Subway No.2 at Vashi Ply.Stn.Part-II Electrification of 2 wheeler Fee collection centre near High mart No.2 in the Forecourt area at Vashi Ply.Stn. Cum commercial complex.
CIDCO
27/10/1994
Providing H.T.Metering equipment for ESR/GSR sector- 5E & 6(W)at New Panvel Node.
CIDCO
12/12/1994
External Electrification with L.T. underground cable for construction power at N.R.T Housing,Nerul,
CIDCO
27/01/1995
Providing Street lightining in forecourt area of Kharghar Railway station cum Commercial Complex.
CIDCO
11/07/1994
Shifting of 22 KV H.T. Line from the plotr No.32, Sector-1 at Nerul.
CIDCO
15/06/1994
Operation & Maintance of Sub- station,Area/road lighting,D.G.sets ,Control Panels etc. in the fore Court are of vashi Railway station cum Commercial Complex.
CIDCO
07/07/1995
Conversion of 22KV Taloja- panvel over head line in to under ground cable at Belapur-Panvel Railway line at khandeshwar.
CIDCO
26/10/1995
Suppling erection and Commissioniong of 11KV straight joint near ESR/GSR in Sector -29 at Vashi.
CIDCO
10/04/1995
Providing 3CX300 Sq.mm 11KV(E) Power cable for Interconnection of the substations of mass housing Schemer,at sector -21,CBD/ Belapur.
CIDCO
17/01/1996
Providing and erecting 31/2X240 Sq.mm armoured cable to NRI housing project, nerul for resortingthe temporary power supply to M/s Shirke B.G Construction work.
CIDCO
22/01/1996
Providing and erecting 3.5X240 Sq.mm armoured cable to NRI housing project, Nerul for resorting the temparory power supply given from straight joint feeder pillar up to the site of M/s.B.G.Shirke
CIDCO
15/02/1996
Suppling erecting 31/2 CX240 Sq.mm armoured cable to NRI Housing project, Nerul for resorting the temporary power supply given from straight joint feeder pillar up to the site of M/s. Advance Construction Co.
CIDCO
16/08/1996
Providing laying and commissioning 11KV (E) 3CX 300 sq.mm. XLPE power cable for Interconnection of the S/S of Mass housing Scheme at Sec-21 to 25,Sanpada,Navi Mumbai.
CIDCO
30/10/1996
Providing area lighting for garden -cum-play ground in sector -7,Sanpada,Navi Mumbai.
CIDCO
20/02/1997
Replacement of 11KV (Earthed)3CX300sq.mm damaged cable at mass housing scheme at sec-9, Kopar khairane, Nvi Mumbai.
CIDCO
17/03/1997
Providing laying & commissioning of 11 KV 3CX300 Sq.mm XLPE cable for Inter Connection of substation and extending 11KV power supply to mass housing scheme at sec-46,48&48 (A) Nerul,Navi Mumbai.
CIDCO
28/05/1997
Providing laying & commissioning of 11 KV 3CX300 Sq.mm XLPE cable forming power supply to mass Housing Scheme in Sec-4,6,16&18,Nerul,Navi Mumbai.
CIDCO
9/10/1998
Supplying Installing Testing & Commissing of at 2 & 500 KVA D.G sets along with AMF Panel for Vashi Railway station Cum Commerical Complex.
CIDCO
03/11/1998
Award letter in respect of work pertaining to fitting and fixturs (Electricals) at CFS,Navi Mumbai.
CIDCO
26/04/1996
Providing ,laying and Commissioning of 11 KV (Earthed)3X300 sq.mm.XPLE Cable and other Electricals Equipment for ESR/GSR, Sector, Sector -44,Nerul &Sewage Pump House,Sector-50,Nerul.Navi Mumbai
CIDCO
24/02/1998
Restoration of Power supply to ESR/GSR,Sector-44,Nerul
CIDCO
09/11/1998
Shifiting of H.T.Pole from plot No.F-1, 12.5% scheme at Diwalpada, Belapur, Navi Mumbai.
CIDCO
09/09/1997
Providing Pumping machinery at MBR, Sector-9 Nerul, navi Mumbai.
CIDCO
15/12/1997
Providing erecting testing and commessioning 22/11/0.4 KV temporary out door type transformer substation for mass Housing scheme in sector-30,Dronagiri.
CIDCO
25/11/1998
Providing 200 KVA 22/11 KVA/433 Volts out door type transformer sub station with D.G.set at custom Bonded warehouse, Dronagiri Node,Navi Mumbai.
CWC
01/09/1999
Supply of materials for Electrical work for supply of H.T. Power from MSEB tapping point to central warehousing Corporation substation at custom Bonded warehouse (3.5 Ha.plot) Sector-1D' Node,Navi mumbai.
CWC
01/09/1999
Tender for electrical work proposed School for the DAV Trust at plot No.11. sector -10,Airoli, Navi Mumbai.
27/10/1998
Award letter for work fittings and fixtures (Electricals) at CFS, Navi Mumbai
CFS
06/12/1999
Providing Power supply arrangement for neighbourhood shopping centre at sector-4 Nerul.
CIDCO
01/03/1999
Power supply arrangement to mass Housing scheme at sector-21 to 25, Sanpada,Navi Mumbai
CIDCO
09/09/1997
Augmentation of Pumping Capacity at MBR, Sector-18, Koperkhairane,Navi mumbai.
CIDCO
08/12/1994
Providing submercible pumpset at Sewage Pumphouse sector -12,kalampoli.
CIDCO
23/05/1994
Shifting of 22kV overhead H.T.line from 20 m.wide road from Nerul Railway station to sector 19, 
CIDCO
26/05/1994
Shifting of 22KV overhead H.T.line Plot No-12, Sector-6, Airoli.
CIDCO
11/07/1994
Shifting of 22KV  H.T.line from the Plot No-32, Sector-1 at Nerul.
CIDCO
06/11/1995
Providing pumping machinery and allied works for ESR/GSR Sector -19 Airoli, Navi Mumbai.
CIDCO
08/12/1997
Providing testing and commissioning of 500 KVA D.G sets along with AMF panel for Vashi Railway station Bldg.Cum Commerical Complex.
CIDCO
10/06/1997
Maintenance of transformer S/s for water supply pumping station in Vashi sanpada and Kopar khairane.
CIDCO
19/08/1997
Operation Maintenance of pump house &water tanks in NRI Housing complex at nerul,Navi Mumbai
CIDCO
27/03/1998
Shifting reatignment and conversion of H.T.overheadline of MSEB obstructing to mahape ROB.
CIDCO
09/11/1998
Laying & Commissioning of 3CX300 sq.mm 11 KVXLPE cable for providing power supply to mass houseing Scheme (CA No.1) at sector-46,48&48 (A),Nerul
CIDCO
09/11/1998
Urgent repairs at ESR in sector -5 Aireoli and MBR in Sector-19,Nerul.
CIDCO
21/09/1998
Electrical repair and maintenance of water supply installations in Nerul Node
CIDCO
06/08/1998
Power supply arrangement to sewage pump house sector-21 sanpada, navi Mumbai.
CIDCO
12/08/1998
Operation & Maintenance of for the work of Providing Pumping Mechinery and Allied work of ESR/GSR, Sector - 19, Airoli, Navi Mumbai.
CIDCO
06/08/1998
Maintenance of Electrical & Mechanical equipment & are lighting for water supply pumping  station in CBD,Nerul & Airoli.
CIDCO
06/08/1998
Maintenance of Electrical & Mechanical equipment & area lighting for water supply Pumping stationin CBD, Nerul & Airoli 
CIDCO
25/11/1998
Providing 200 KVA 22/11 KVA/433 Volts out door type transformer sub station with D.G.set at custom Bonded warehouse, Dronagiri Node,Navi Mumbai.
CIDCO
01/03/1999
Power supply arrangement to mass Housing scheme at sector-21 to 25, Sanpada,Navi Mumbai
CIDCO
01/11/1999
Providing,testing & Commissioning HT Switchgear,Transformer,LT Panels.HT/LT cables & necessarywiring for the power supply arrangement at Sanpada Rly- station Building cumCommercial complex.
CIDCO
08/04/1996
Maintenance of transformer Sub-station for water supply.Installations at Sanpada, vashi and Koparkhairane
CIDCO
25/02/1999
Maintenance of transformer sub station for water supply pumping station in Sanpoda, Vashi and Koperkhairane
CIDCO