Projects
Client List
   
 
22/9/2003
Operation and Maintenance of electrical installations in Railway area, Commercial area& Fore court area of Juinagar Railway station Complex.
CIDCO
2/5/2000
The work of Internal Electrification along with area lighting inside the compound of our residential
MSEB
1/9/1999
Electrical work for getting supply of H.T Power from MSEB tapping point to cwc sub station at custom bonded ware house (3.5Hect plot) D 'Node Navi Mumbai.
CWC
27/5/1999
Tender for Capacitor Panel,SDO (C) CONWARE CFS Navi Mumbai
CONWARE
25/11/1998
Providing and maintaining street lightings on Airoli-Muland Link Road.
MSRDC
20/11/1998
Maintenance of Transformer sub-stations for water supply Pumping stations in CBD Airoli Nodes.
CIDCO
25/11/1998
Providing and maintaining street lightings on Airoli-Muland Link Road.
MSRDC
13/1/1998
External Electrification work for NRI housing scheme at secture 54 56858 (Part)Nerul  new bombay.
CIDCO
11/3/1998
Shifting and Raising of hight of 22KV HT over head time Near channel on 20 mtr.wide road between NH-4&NH-4B in sector -16, New Panvel (w)
CIDCO
8/5/1998
Repairing of 150 KVA 22/11/0.4KV. Outdoor type transformer at water supply installations in Sector-19 Vashi&Sector-1, CBD, Navi Mumbai.
10/8/1998
External electrical installation work for the staff quarters 'A' 'B & ''C' Type visiting officers Building and Community centre on plot No-3.0and 3.2,sector -13,Neru,Navi Mumbai.
CIDCO
22/2/1997
Maintenance of electrification and street lighting works operation & maintenance of water supply fire fighting Pump house & water Tanks,in NRI Housing Complex at nerul, Navi Mumbai.
CIDCO
22/4/1997
Providing and erecting two pole structure for power supply arrahments to office Complex building at Dronagiri.
CIDCO
30/4/1997
Repairs to High tension winding of 250 KVA transformer at MBR Nerul, Navi Mumbai.
CIDCO
 30/11/1997
Shifiting of Re aligmentm of 22 KV. H.T.O/H line at Thane- Belepur Road Near Nerul Rly. Station, Nerul.
CIDCO
30/4/1997
External Electrical Installation work for staff Quarters Under Construction on plot No.3.0 and 3.2, sector-13 Nerul, Navi Mumbai
Bank of India
13/5/1997
Shifiting & Re aligment of 22 KV. H.T. line Passing over the plot No.111 insector -21Nerul,Navi Mumbai
CIDCO
27/5/1997
Repairs to 200KVA, 22KV Transformer at GSR insector -9 Nerul, Navi Mumbai.
CIDCO
9/6/1997
Maintenance of transformer S/s for water supply pumping station in CBD.Nerul and Airoli.
CIDCO
1/7/1997
Transformer oil filtration D.p Structure painting and miscellaneous maintenance works at H.T.sub Nerul and Airoli  Navi Mumbai stations for water supply installations inVashi,Sanpada, and Koper Rhairane.
CIDCO
1/7/1997
Filtration and topping at transformer oil at H.T.Sub - station for water supply installation in CBD,nerul and Airoli, Navi Mumbai. 
CIDCO
21/8/1997
Suppling & Fixing of HPSV bulbs,supplying of electrification & Plumbers for urgent maintenanceof existing street lights & water supply network in NRI Complex for Megha feast-97 on 23rd &24th August.
CIDCO
30/9/1997
Replacing of 240 sq.mmL.T.lable by 400 sq.mm Pvc om .L.T. lable at water supply installation ,sector 17.Kopay Khaiane,Navi Mumbai
CIDCO
23/12/1997
Shifting of Electricity Pols& D.P Structure with transformer from plot No.29-Sector-10Nerul.
CIDCO
22/3/1996
Repairs to 200 KVA Distribution T/F in ESR/GSR sector -29 at Vashi,Navi Mumbai.
CIDCO
22/3/1996
Shifting and Re-aligment of 22 KV H.T. over head line from plots and 30 mtr.wide road near owe village at khargar.
CIDCO
8/4/1996
Preventive maintenance of transformer sub station for ESR/GSR complex in CBD Nrul&Airoli, Navi Mumbai
CIDCO
9/5/1996
Providing erecting and commissioning 22KV/11/0.4 KV type transformer sub- station and 22 KV in coming cables for office complex bldg at Dronagiri.
CIDCO
19/6/1996
Sub-station maintenance work in ESR/GSR in sector-29& sector 19 at Vashi,Navi Mumbay.
CIDCO
24/6/1996
Replacement of cable bus bar chambar in ESR/GSR in sector -1 A CBD and Providing instrument Panel for 2 Nos of 50 Hp Pump at sector-1 CBD
CIDCO
24/6/1996
Replacement of Power cable for transformer in strom water pump house sector-8, Navi Mumbai
CIDCO
1/8/1996
Providing temporary arragement of electric power supply to NRI Buildings in NRI Housing Project at nerul,Navi Mumbai.
CIDCO
6/9/1996
Repairs to 250KVA transformer in MBR at sector 17 Nerul,Navi Mumbai
CIDCO
19/10/1996
Repairs and maintance work at fire station, sector-18,New Panvel (East).
CIDCO
12/1/1996
Modifications to stay of double pole structure painting of transformers and repairs to G.O.D for water supply installation.
CIDCO
17/1/1996
Providing and erecting 31/2 X240 sq.mm armoured cable to NRI Housing project,Nerul for resoorting the Temporary power supply given to M/s.Advanced Construction Co.for Conrt.Work .
CIDCO
25/1/1996
Replacement of cable in ESR/GSR Koparkhairane and minor repairs to transformer in ESR/GSR in sector-3 at Airoli.Navi.Mumbai.
CIDCO
25/1/1995
Maintence of Transformer S/s for ESRGSR Complex from Cbd to Airoli
CIDCO
1/2/1995
Repair to 150KVA & 200KVA transformer in ESR/GSR sector -18 Koperkhairane and  sector-29 at Vashi
CIDCO
28/6/1995
Maintance of Transformer substation for ESR/GSR complex in CBD,Nerul,Sanpada,Vashi,Airoli and koperkhairane. Navi Mumbai.
CIDCO
31/7/1995
External Electrification work for NRI Housing Scheme at sector -54,56and 58(part) Nerul,Navi Mumbai.
CIDCO
4/10/1995
Electrical maintence and repair work at out door 22/0.433 KV sub-station for watre supply pumping station.
CIDCO
5/10/1995
Replacement of main supply cable for MBR No.2 in sector -17at Nerul,Navy Mumbai.
CIDCO
20/10/1995 
Shifting and Realignment of  22KV H.T. line insector-25  to Dharave Village,Nerul,Railway station.
CIDCO
6/12/1995
Shifting and Realignment of  22KV H.T. line in Front of Air India plot insector-23 and removing of two nos.of stays in front of MBR sector -17, nerul,Navi Mumbai.
CIDCO
14/3/1994
Operation and maintenance of Street lighting in Sanpada node.navi Mumbai
CIDCO
17/2/1994
11/0.4 KV Indoor Transformer S/s and external electrification of the mass Housing Scheme (S/s)(No.2)at sector -26 Vashi,New Bombay
CIDCO
31/5/1994
Providing Trivector Meter for Street lighting sub station in new Bombay.
CIDCO
14/4/1994
Providing street lighting on Pathway in sector -2,at Vashi,New Bombay.
CIDCO
31/3/1994
Operation & maintance ofStreet lighting in Nerul node
CIDCO
24/5/1994
Work Order for Providing 11 KV/433 V Indoor tupe Transformer Substation and other  realated works.
S.B.I
31/5/1994
Repairs to 250 Kva transformer at ESR/GSR sector-29 at Vashi, Navi Mumabai
CIDCO
31/5/1994
Supplying & errection of semihighmart fitting at a Junction near Petrol Pump in sector- 26 at vashi Navi Mumbai.
CIDCO
9/6/1994
Balance strrt lighting on a 30 mtr wide road in sector -15, CBD Belapur.
CIDCO
21/6/1994
Repairs to 150 KVA transformer at ESR/GSR sector-20 at Vashi, Navi Mumabai
CIDCO
17/11/1994
Repairs to 200 KVA &100 KVA Distribution Transformer 
CIDCO
6/12/1994
Shifting and Realignment of   22KV H.T. line passing over institute of Marine Engineers  plot of 30 mtrs.wide road from PCB Road  Nerul Railway station.
CIDCO
17/1/1994
Shifting and Realignment of  MSEB'S 22KV H.T. line in From Village approach road at Koper khairane
CIDCO
14/6/1993
Shifting and realignment of MSEB'S 22KV H.T. line From some of the plot on Paraik Hill CBD,Belapur
CIDCO
06/8/1993
Providing street lighting in sector-10 & 1on Balance road at Kalamboli Housing Complex
CIDCO
10/11/1993
Suppling,erecting,testing and commissioning of additional 62.5 KVA Dies Elengine Driven A.C Generator
CIDCO
3/3/1993
Providing street lighting on 11mtr wide road along with channel in sector 29 at Vashi, New Bombay
CIDCO
 
| Home | Profile | Civil |

Electrical

| Photo Gallery | Help Desk | Testimonials | Enquiry | Contact Us |